Preserving the historical Québec Bridge for future generations (2024)

Preserving the historical Québec Bridge for future generations (1)Browser not supported

This website is not compatible with Internet Explorer or older version of Microsoft Edge(version 78 and older).

For full functionality please use a supported browser.

  1. Home
  2. news
  3. news releases
  4. Preserving the historical Québec Bridge for future generations

Go to the translated article

Quebec City, Quebec

For over 100 years, the Québec Bridge has stood as a testament to the innovation and hard work of Canadians, linking communities and businesseson both sides of the St.Lawrence River. In recent years, the Government of Canada has been working to identify the best path forward to ensure the bridge’s long-term sustainability, and today we are taking an important step toward that goal.

The Prime Minister, Justin Trudeau, today announced an agreement with the Canadian National Railway (CN), the current owner of the Québec Bridge, to repatriate this essential and historic infrastructure to the federal government and support its long-term viability. Canada will invest approximately $40million per year for the next 25 years through its rehabilitation program. These investments will help extend the bridge’s useful life for decades to come, notably by increasing the frequency at which parts are replaced. The rehabilitation program also includes a contribution component for painting and aesthetics of this historic infrastructure.

The Québec Bridge is a major road, rail, and pedestrian bridge linking the shores of Quebec City and Lévis, Quebec. Built in 1917, it was designed to boost economic development and connect Quebec City to the Canadian and American rail networks. Considered one of Canada’s architectural gems, it is recognized as a symbol of engineering excellence and wasdesignated a National Historic Site of Canada in 1995.

Today, the bridge remains a critical regional transportation link, a strategic freight corridor, and an important element of the Canadian supply chain, allowing passengers and goods to move freely across the St.Lawrence River and to other destinations in Canada and North America. More than 33,000 vehicles, including cars, transit buses, passenger trains, and freight trains, cross the bridge daily. During the summer months, it is also enjoyed by some 1,000 pedestrians and cyclists every day.

The repatriation agreement is the result of significant consultations and negotiations with CN, the Government of Quebec, and other stakeholders. The agreement will position the federal government to restore and maintain the structure of theQuébec Bridgeto ensure it can continue tobenefit our economy and all users and residents of Greater Québec –preserving the bridge’s historical, cultural, and economic value for future generations.

Quotes

“The Québec Bridge is a source of pride for the people of Quebec City and all Canadians. It is a timeless symbol of what is possible when we work hard together, and today’s repatriation agreement with CN will ensure that it is protected and restored for future generations.”

The Rt. Hon.Justin Trudeau, Prime Minister of Canada

“The Québec Bridge is a feat of civil and architectural engineering in our country. By repatriating the bridge, we will not only ensure the sustainability of this critical and major infrastructure for the region, but we are also giving control back to the people of Québec.”

The Hon.Jean-Yves Duclos, Minister of Public Services and Procurement

“The Québec Bridge is part of the city’s history. It’s part of the identity and pride of the people of Quebec City. By repatriating this essential link, we are fortifying and preserving both our heritage and our future prosperity.”

The Hon.Pablo Rodriguez, Minister of Transport and Quebec Lieutenant

Quick Facts

  • The Québec Bridge was designed and built by the St.Lawrence Bridge Company of Montréal, Quebec, in 1917. Made of nickel alloy steel, it was the longest clear span bridge in the world at the time of its construction. It was officially inaugurated by the Prince of Wales – the future King EdwardVIII – in 1919.
  • Initially designed as a rail bridge, the Québec Bridge now also includes three highway lanes and a walkway for pedestrians and cyclists. It remains the longest span cantilever bridge ever built, stretching 549 metres between the main piers, with a total length of 987 metres and a height of 95 metres.
  • The bridge was under ownership of the Government of Canada from its construction until 1995, when it was transferred to Canadian National Railway (CN).
  • In 2019, the Government of Canada appointed Mr.Yvon Charest as Special Negotiator to examine options for the bridge’s restoration and life extension. Following extensive consultations with CN and otherstakeholders, the government received Mr.Charest’s recommendations in 2021 and extended his mandate for the negotiation of an agreement to transfer ownership of the bridge to the federal government.

Related Products

Associated Links

Preserving the historical Québec Bridge for future generations (2024)
Top Articles
Latest Posts
Article information

Author: Dean Jakubowski Ret

Last Updated:

Views: 6175

Rating: 5 / 5 (50 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Dean Jakubowski Ret

Birthday: 1996-05-10

Address: Apt. 425 4346 Santiago Islands, Shariside, AK 38830-1874

Phone: +96313309894162

Job: Legacy Sales Designer

Hobby: Baseball, Wood carving, Candle making, Jigsaw puzzles, Lacemaking, Parkour, Drawing

Introduction: My name is Dean Jakubowski Ret, I am a enthusiastic, friendly, homely, handsome, zealous, brainy, elegant person who loves writing and wants to share my knowledge and understanding with you.